Для тех, кто интересуется безопасным доступом к онлайн-играм, наш партнер предлагает зеркало Вавады, которое позволяет обходить любые блокировки и сохранять доступ ко всем функциям казино.

Reputational Crisis Forces Cambridge Analytica’s Closure

Most of us are aware of the recent scandal involving Facebook and political consulting firm Cambridge Analytica, wherein the latter company obtained data from up to 87 million Facebook users and, in turn, built profiles of individual voters and their political preferences to best target advertising and sway voter sentiment. This information was used to enable Donald Trump’s campaign in the 2016 presidential election.

Right around that time it was reported that the Cambridge Analytica board of directors suspended CEO Alexander Nix. This action was taken after a whistleblower claimed Nix set up a “fake office” in Cambridge to present a more academic side to the company, and made comments to undercover reporters  that “do not represent the values or operations of the firm and his suspension reflects the seriousness with which we view this violation.”

A feature about the scandal in Risk Management’s current issue explains why the incident was not a data breach and how companies can learn from this and comply with EU’s General Data Protection Regulation (GDPR) in time for its May 25 implementation.

In the aftermath of the scandal and Cambridge Analytica’s concession that it will not be able to recover from its reputational crisis—although the company’s leadership maintains that it acted ethically—the UK-based firm and its affiliates announced on May 2 that it will be “ceasing all operations.” Excerpts from its statement are below:

Over the past several months, Cambridge Analytica has been the subject of numerous unfounded accusations and, despite the Company’s efforts to correct the record, has been vilified for activities that are not only legal, but also widely accepted as a standard component of online advertising in both the political and commercial arenas.    

Despite Cambridge Analytica’s unwavering confidence that its employees have acted ethically and lawfully, which view is now fully supported by [Queen’s Counsel Julian Malins] report, the siege of media coverage has driven away virtually all of the Company’s customers and suppliers. As a result, it has been determined that it is no longer viable to continue operating the business, which left Cambridge Analytica with no realistic alternative to placing the Company into administration.

buy cellcept online thecifhw.com/wp-content/uploads/2023/10/jpg/cellcept.html no prescription pharmacy

This once again demonstrates how attacks in the court of public opinion can cripple a business.

buy chloroquine online thecifhw.com/wp-content/uploads/2023/10/jpg/chloroquine.html no prescription pharmacy

Despite a fast reaction and being exonerated by a credible authority, no amount of crisis management and communication could make up for the actions of Cambridge Analytica’s leadership. It also seems that the company had not considered a business continuity plan for a reputation crisis of this magnitude.

Last year, Steel City Re CEO Nir Kossovsky wrote for Risk Management Monitor about reputational risk—reflecting on it and warning of the consequences to an organization. When public anger rises, he said, “more blame is being cast upon recognizable targets, such as CEOs.”

And while Facebook CEO Mark Zuckerberg seems to have dodged the bullets fired his way during a Congressional hearing last month (did you #deletefacebook?), Cambridge Analytica’s leadership knew that, based on its actions and the cavalcade of accusations, neither their clients nor the public would ever “like” them again.

buy zithromax online thecifhw.com/wp-content/uploads/2023/10/jpg/zithromax.html no prescription pharmacy

Business and Employee Safety During Crisis Explored at RIMS 2018

SAN ANTONIO – Emergency preparedness and action plans amid violent crises were explored during educational sessions at RIMS 2018 here. On Monday and Tuesday, experts discussed ways businesses can prepare for active shooter events and kidnapping crises. Experts agreed that in such events, lives, operations, reputation and finances are all at stake.

Some highlights from the sessions:

Kidnapped! A Crisis Simulation Exercise
Bill Laurence, head of crisis management at S-RM offered a kidnap simulation for a well-attended session on Monday. Laurence provided a scenario, asking the audience to assume a collective role as decision-makers of a fictitious, billion-dollar coffee company that has an executive abducted in Mexico. The group’s assignment was to create a crisis management team and decide who the communicator would be, how they would respond to threats and what information to relay to their insurance provider, among other critical actions.

“The first 24 hours are always the most critical during a kidnapping or ransom scenario,” Laurence said.

The simulation included real-life audio and video examples of terrifying ransom-demanding calls. The team learned that the kidnapper has typically planned the abduction in advance and always has control of the situation – beginning with communication. “For that reason alone, you cannot speed up the process,” Laurence said.

And although things may seem dire, he explained ways to glean information – and feel somewhat positive – even after a brief phone call. “We all react differently to pressure,” he said. “But avoid speculation and always prepare for the next call.”

Read more about kidnapping in a Q&A with the session’s co-host, Denise Balan, senior vice president and head of U.S. kidnap & ransom at XL Catlin, on page 9 in Tuesday’s Show Daily.

Active Threat and Workplace Violence on Campus: Preparedness, Response and Recovery
Craig McAllister, Cornell University’s director of risk management and insurance, opened a session on Tuesday with a discussion of duty of care and the obligation to the campus or work environment.

He pointed out that, in early January, the National Fire Protection Association (NFPA) processed its NFPA 3000 Standard as a provisional one to streamline the program elements necessary for organizing, managing, and sustaining an active shooter and/or hostile event response program. The standard gained even more input following the Marjory Stoneman Douglas High School in Parkland, Florida, on Feb. 14 in an effort to reduce or eliminate the risks, effect, and impact on an organization or community affected by these events

Paul Mills, global kidnap prevention manager at AIG, followed with a segment addressing best practices for violent incident preparation and response. He discussed response and resilience training for employees who need enhanced preparedness with the rise of violence against soft targets.

He noted that advances in technology often are putting people in harm’s way by default. “People are distracted to the point where they are unaware of the threats they face. It’s also delaying and inhibiting their response times,” he said. “Without even realizing it, they often portray victim-like behavior.”

Kendell Moore, senior vice president at the Abernathy MacGregor Group, delved into the key crisis management sources of an organization’s response support, both internally and externally. She used a mass shooting that occurred inside a local business in the western United States (that is also part of a major American chain) as an example of an entity that needed to enact its crisis communication plan immediately after the attack.

Moore offered some crisis communication principles:

  • Media is a conduit, not an audience. “The media needs to catch up to the actions of the business.”
  • Speak directly to the impacted. “It is most important to communicate with victims, loved ones, the community and those who are directly affected.”
  • Take action, not credit. “No statement, no matter how eloquent, can substitute for doing the right thing.”
  • Communicate what matters when it matters. ““What is said first must stand the test of time. So announce nothing and predict nothing that isn’t solid and certain.”
  • Build relationships in the community. ““Work alongside local law enforcement, government officials and those who know the community best.”
  • Listen to people’s needs and requests. “Ask what people need, rather than telling them what you think they need.”

Amtrak Positive About Meeting PTC Deadline

Earlier this month, Amtrak President Richard Anderson told the House railroads subcommittee that his company is on target to complete installation of positive train control (PTC) on the infrastructure it controls and on all of its equipment by the Dec. 31, 2018 federal deadline. He warned, however, that trains without PTC by the deadline could not use Amtrak’s tracks.

“We believe that PTC should ultimately be in place for all Amtrak routes and, as a matter of U.S. policy, PTC should be required for all passenger rail trips in America,” Anderson told the House Subcommittee on Railroads, Pipelines and Hazardous Materials.

PTC is designed to eliminate human error by using four components: GPS satellite data, onboard locomotive equipment, the dispatching office and wayside interface units. The system communicates with the train’s onboard computer, allowing it to audibly warn the engineer and display the train’s safe braking distance based on its speed, length, width and weight, as well as the grade and curvature of the track, according to railroad operator Metrolink.

buy champix online www.methanol.org/wp-content/uploads/2022/08/png/champix.html no prescription pharmacy

If the engineer does not respond to the warning, the onboard computer will activate the brakes and safely stop the train.

Anderson’s testimony poses a challenge for major transportation providers like NJ Transit, whose trains run on the Northeast Corridor east of the Hudson River tunnels to New York City. Committee members have noted that NJ Transit “hasn’t even started” the process of installing PTC, while the company’s spokeswoman maintains that despite delays attributed to software compatibility, she believes they can meet the deadline. According to a Federal Railroad Administration progress report, 8% of NJ Transit’s locomotives and none of its tracks were updated with PTC as of the end of 2017.

After Congress passed the PTC Enforcement and Implementation Act of 2015 it also authorized the FAST Act, which allocated $199 million in PTC grant funding and specifically prioritized PTC installation projects for Railroad Rehabilitation and Improvement Financing funding. The Association of American Railroads estimates that freight railroads will spend $10.6 billion implementing PTC, with additional hundreds of millions each year to maintain. The American Public Transportation Association has estimated that the commuter and passenger railroads will have to spend nearly .

buy vibramycin online www.methanol.org/wp-content/uploads/2022/08/png/vibramycin.html no prescription pharmacy

6 billion on PTC.

“Without PTC, the system is too vulnerable to single points of failure, many of which are dependent upon the memory of a single human being interacting with a big, complicated system,” Anderson said. “When an engineer loses situational awareness or forgets a rule, we have no systems to assist them and help them prevent that error.”

He also noted that Amtrak is taking additional steps, such as installing inward-facing cameras. “These cameras monitor locomotive and engineer performance and are installed in Amtrak trains along routes in the northeast, midwest, and west and we are actively working to install them on Amtrak trains nationwide. Reviewing the data from these cameras, coupled with the data from our efficiency testing programs, provides us an excellent view of operational issues to be addressed in future training programs.”

Efforts to upgrade train technology has been a nationwide priority. The most recent major derailment occurred on Dec. 18, 2017 when an Amtrak train derailed near Tacoma, Washington, killing three passengers and injuring about 100. That crash was the result of excessive speed in a steep curve, which experts suggested could have been prevented with PTC’s automatic braking technology. Amtrak Train No. 501, on its inaugural run, was traveling 80 miles per hour in an area limited to 30 miles per hour when it derailed on an overpass, sending the train’s 12 coaches and one of its two engines careening onto the highway below.

As previously reported in Risk Managementa similar derailment in Philadelphia in May 2015 that killed eight, was also blamed on excessive speed and could have been avoided if PTC had been in place.

New Bill Would Toughen Calif. Dam Inspections

DWR Photo: Lake Oroville on Jan. 19, 2018 with lake levels at 707 feet.

A year after the spillway collapse at the Oroville Dam, leading to evacuations of almost 200,000 residents and a beat-the-clock patching job to avoid a break in the tallest dam in the United States, new legislation to strengthen inspections of dams awaits approval of California Gov. Jerry Brown.

The bill would require annual inspections for high hazard dams, raise inspection standards and require consultation with independent experts every 10 years, according to ABC News.

As reported by Risk Management Magazine, problems at the Oroville Dam began when the dam’s main sluice was damaged after a winter season of record rain and snowfall, following five years of drought. Torrential rainfall caused water levels to rise so quickly that large amounts needed to be released to prevent the dam from rupturing and sending a wall of water to the communities below.

A recent report of the root-cause of the spillway failure by the Independent Forensic Team (IFC), which includes members of the Association of State Dam Safety Officials and the United States Society of Dams, notes that:

There was no single root cause of the Oroville Dam spillway incident, nor was there a simple chain of events that led to the failure of the service spillway chute slab, the subsequent overtopping of the emergency spillway crest structure, and the necessity of the evacuation order. Rather, the incident was caused by a complex interaction of relatively common physical, human, organizational, and industry factors, starting with the design of the project and continuing until the incident. The physical factors can be placed into two general categories:

  • Inherent vulnerabilities in the spillway designs and as-constructed conditions, and subsequent chute slab deterioration

  • Poor spillway foundation conditions in some locations

The IFC report concludes that all dam owners in the state need to “reassess current procedures” in light of its findings.

According to the IFC:

“The fact that this incident happened to the owner of the tallest dam in the United States, under regulation of a federal agency, with repeated evaluation by reputable outside consultants, in a state with the leading dam safety regulatory program, is a wake-up call for everyone involved in dam safety. Challenging current assumptions on what constitutes ‘best practice’ in our industry is overdue.”

Initial response to the spillway failure included erosion mitigation for both spillways during the incident, sediment removal and installation of temporary transmission lines at a cost of $160 million, According to the DWR. Phase-two includes removal of the original 730 feet of the upper chute, replacing it with structural concrete.